a truck dumps a load of gravel onto a construction site a bulldozer moves toward a pile of gravel gravel is graded by a bulldozer, the Tacoma Lift Bridge in the background a bulldozer pushes gravel forward a closeup of gravel being grade by a bulldozer gravel is compacted by a compaction roller a vibroflotation machine is lifted by crane long-distance view of the Port Maritime Center Construction site

Port Maritime Center

Date: 2025-2026
GET A QUOTE

Description

The Port Maritime Center is a mixed use building that will include business offices and classrooms. Read more on the Port of Tacoma website.

Materials

Gravel Borrow
7,000 tons of 1¼” Clean Ballast

Highlights

Washington Rock's gravel borrow replaced poor-quality soil on site. Our crushed rock was also used in a vibroflotation machine to build stone columns. Our base course was used to create a foundation for building construction.