gravel surrounds long stretches of tubes called infiltration chambers gravel surrounds long stretches of tubes called infiltration chambers gravel surrounds long stretches of tubes called infiltration chambers gravel surrounds long stretches of tubes called infiltration chambers

Monroe Avenue Storm System

Date: 2024
GET A QUOTE

Description

The Monroe Avenue NE System Improvement project began in December 2023 and finished in November 2024. The 2.2 acre stormwater system in Renton, Washington, replaces a temporary system. The new system is designed to handle a 100-year storm event. The system serves a 245 subbasin.

Materials

73,200 tons of AASHTO #3

Highlights

Washington Rock specially produced over 2,400 truck-and-trailer loads of AASHTO #3 for this project. We maintained a steady supply of material throughout construction.

Learn more about the project on the City of Renton project page.